The Manitoba Gazette — Volume 155 No. 6 — February 11, 2026

Government Notice — Under The Environment Act — Proposal

On this page:

  1. AMRIZE CANADA INC. - AMRIZE CONCRETE PRODUCTS – FILE: 6279.00
  2. CENTRA GAS MANITOBA INC. – NEEPAWA GAS TRANSMISSION PIPELINE – FILE: 6259.00

AMRIZE CANADA INC. - AMRIZE CONCRETE PRODUCTS – FILE: 6279.00

Notice of Environment Act Proposal

Manitoba Environment and Climate Change invites public comment on the following proposal:

AMRIZE CANADA INC. - AMRIZE CONCRETE PRODUCTS – FILE: 6279.00

Amrize Canada Inc. (Amrize) submitted an Environment Act Proposal for continued operation of a precast concrete batch plant at 185 Dawson Road N in the City of Winnipeg. The facility manufactures products such as concrete hollow core, precast, and pipe for the City of Winnipeg and surrounding area.

This proposal can be viewed at www.manitoba.ca/sd/eal/registries

Anyone affected by the proposal who wishes to provide feedback should submit their comments using the online form at www.manitoba.ca/sd/eal/registries by March 9, 2026.

Information submitted in response to this proposal will be available to the proponent and placed on the public registry per Section 17 of The Environment Act.

Environmental Approvals Branch
Manitoba Environment and Climate Change

Box 35, 14 Fultz Boulevard Winnipeg MB R3Y 0L6
Toll-Free: 1-800-282-8069
Website: www.manitoba.ca/sd/eal/registries

3-6

CENTRA GAS MANITOBA INC. – NEEPAWA GAS TRANSMISSION PIPELINE – FILE: 6259.00

Notice of Environment Act Proposal

Manitoba Environment and Climate Change invites public comment on the following proposal:

CENTRA GAS MANITOBA INC. – NEEPAWA GAS TRANSMISSION PIPELINE – FILE: 6259.00

Centra Gas Manitoba Inc. proposes to build a 20.2 kilometre-long and 6-inch diameter natural gas transmission pipeline in the Municipality of North Cypress-Langford that will run between two control points located approximately 3.5 and 22.5 kilometres south of the Town of Neepawa. The proposed route generally parallels Provincial Trunk Highway 5. If approved, construction is anticipated to begin in the winter of 2027 and take up to a year to complete.

This proposal can be viewed at www.manitoba.ca/sd/eal/registries

Anyone affected by the proposal who wishes to provide feedback should submit their comments using the online form at www.manitoba.ca/sd/eal/registries by March 09, 2026.

Information submitted in response to this proposal will be available to the proponent and placed on the public registry per Section 17 of The Environment Act.

Environmental Approvals Branch
Manitoba Environment and Climate Change

Box 35, 14 Fultz Boulevard Winnipeg MB R3Y 0L6
Toll-Free: 1-800-282-8069
Website: www.manitoba.ca/sd/eal/registries

1-6